Three-Point Estimation Calculator
Calculate project estimates using PERT and Triangular distributions
Optimistic Estimate (O)
Best-case duration or cost
Most Likely Estimate (M)
Realistic/expected duration or cost
Pessimistic Estimate (P)
Worst-case duration or cost
Distribution Method
PERT (Beta) Distribution
Formula: (O + 4M + P) / 6
Triangular Distribution
Formula: (O + M + P) / 3
Calculate Estimate
Estimation Results
Expected Estimate
-
Standard Deviation
-
Variance
-
Estimated Range (±1 SD, heuristic)
-